Eco@Teck Ghee (Upgrading Old Estate)

  • Project Name: Design, Built, Operate & Maintenance of District PWCS at Teck Ghee
  • Country: Singapore
  • Project Status: On-going
  • This is a retrofit project in a district level.
  • This project once completed will be the biggest district level waste conveyance system in South East Asia and one of the biggest in the world.
  • The project covered: - Throw Points: 6,000 ; - Residential Blocks: 40 ; - Total Pipe Length: 6,167m; - Total Waste Volume: 151,788 litres/day; - Waste Fraction: 2 (General Waste and Recyclable Waste)

To Know More About Teck Ghee